首页> 外国专利> Cost managent system and cost managent method using the same

Cost managent system and cost managent method using the same

机译:使用相同的成本管理系统和成本管理方法

摘要

In a cost management method performed based on activity-based cost in a cost management system including a user terminal and a cost management device, A reference information management step in which a user inputs and manages reference information required for cost management through the user terminal in the cost management device; A detailed inquiry step in which the fixed cost and indirect cost settlement amount for each account input in the reference information management step are aggregated and generated by the cost management device; C/C account distribution inquiry step in which the cost management device searches and aggregates and aggregates the amount of fixed cost and variable cost distribution for each C/C process for the manufacturing common, process, facility common, and equipment input in the standard information management step. ; A first process cost distribution step of adding and distributing process costs required for the process to facilities related to the process to the fixed and variable costs for each C/C process in the cost management device; The second common cost distribution step in which the labor costs of employees designated in the manufacturing common that are commonly used and manufactured are aggregated and distributed by fixed cost and variable cost to the fixed cost and variable cost data for each facility distributed in the first process cost distribution step in the cost management device. ; A third equipment product-specific indirect cost distribution step in which indirect costs including mold cost and outsourcing cost are aggregated and distributed by fixed cost and variable cost to fixed cost and variable cost data for each facility distributed in the second common cost distribution step in the cost management device; The fourth stage in which the fixed cost and variable cost data for each facility distributed in the indirect cost distribution step for each product of the third facility in the cost management device are added by adding the fixed cost and variable cost for the customer's C/C product related to the purchase cost input to the product process. Distributing the purchase cost of C/C products to customers; A cost calculation step of calculating a process cost by using the data on which the fourth customer C/C product purchase cost distribution step has been completed in the cost management device; And A cost management step of performing cost management including at least one of an ideal cost inquiry step, a cost reduction inquiry step, a break-even point inquiry step, a contribution margin inquiry step, and a target profit inquiry step using the calculated process cost; Cost management method comprising a.
机译:以基于基于活动的成本在包括用户终端和成本管理设备的成本管理系统中的基于活动的成本执行的成本管理方法中,参考信息管理步骤,其中用户通过用户终端输入和管理成本管理所需的参考信息成本管理设备;详细的查询步骤,其中参考信息管理步骤中的每个帐户输入的固定成本和间接成本结算量聚合并由成本管理设备生成; C / C帐户分发查询步骤,其中成本管理设备搜索和聚合并汇总为标准信息中的制造公共,过程,设施公共和设备输入的每个C / C过程的固定成本和可变成本分布的量管理步骤。 ;第一加工成本分配步骤,在成本管理设备中为每个C / C过程中的固定和可变成本与过程相关的过程中加入流程所需的过程成本;第二常见成本分配步骤,其中在常用和制造的制造常见中指定的员工的劳动力成本通过固定成本和可变成本来分配到第一个过程中分布的每个设施的固定成本和可变成本数据成本管理设备的成本分配步骤。 ;第三种设备特定的间接成本分配步骤,其中包括模具成本和外包成本的间接成本通过固定成本和可变成本来分配,以固定成本和可变成本数据,每个设施都分布在第二个常见成本分布步骤中的每个设施成本管理设备;通过为客户C / C的固定成本和可变成本添加成本管理设备中的第三个设施的每个产品的间接成本分布步骤中分布的每个设施的固定成本和可变成本数据的第四阶段。产品与购买成本输入的产品流程相关。将C / C产品的购买成本分配给客户;通过使用第四届客户C / C产品购买成本分配步骤在成本管理装置中完成的数据计算过程成本的成本计算步骤;以及执行成本管理的成本管理步骤,包括至少一个理想的成本查询步骤,降低成本查询步骤,休息均衡阶段,贡献保证金查询步骤以及使用计算过程的目标利润查询步骤成本;成本管理方法包括a。

著录项

  • 公开/公告号KR102238926B1

    专利类型

  • 公开/公告日2021-04-13

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR1020190115537

  • 发明设计人 최영휘;최정은;

    申请日2019-09-19

  • 分类号G06Q10/06;G06Q50/04;

  • 国家 KR

  • 入库时间 2022-08-24 18:11:40

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号