首页> 外国专利> Multi sensor data storage/resimulation system and error prediction method

Multi sensor data storage/resimulation system and error prediction method

机译:多传感器数据存储/重新仿真系统和误差预测方法

摘要

The present invention relates to a multi-sensor data storage/resimulation system and an error prediction method for building a timeline-based database that can be stored by applying accurate timing. A method for predicting multi-sensor data storage/resimulation errors according to an embodiment of the present invention includes: a first step of generating an integrated resimulation profile and a divided resimulation profile for resimulation; A second step of obtaining sensor data in parallel from multiple sensors of different types in real time; A third step of processing a first timeline file of generating a divided timeline file included in the divided resimulation profile in parallel, dividing the sensor data into data types, acquiring them in parallel, and storing them in the divided timeline file together with the elapsed time; Step 4 of processing a second timeline file that generates an integrated timeline file through parallel task transmission/reception processing of a plurality of divided timeline files generated in the same time zone, and stores it in the integrated resimulation profile: and 1, 2 Resimulation is performed using a timeline file to analyze, and a preset increase/decrease processing value is continuously reflected in the exponential moving average value of the elapsed time of the first timeline file to predict errors that may occur during data delay and data concentration. Including step 5, the elapsed time of the first timeline file is characterized in that the required time until the sensor data 1 is received and the continuous sensor data 2 is received is treated as the elapsed time.
机译:本发明涉及多传感器数据存储/复备系统和用于构建基于时间线的数据库的误差预测方法,该数据库可以通过应用精确定时存储。根据本发明的实施例的用于预测多传感器数据存储/重新仿真误差的方法包括:生成集成重新估计曲线的第一步骤和用于重新仿真的分割复备曲线;实时从不同类型的多种传感器并行获得传感器数据的第二步;处理第一时间线文件的第三步骤,其并行地将分割的时间线文件生成划分的时间线文件,并行地将传感器数据划分为数据类型,并行地获取它们,并将它们存储在划分的时间轴文件中以及经过的时间;处理第二时间线文件的步骤4,其通过在同一时区生成的多个划分的时间线文件的并行任务发送/接收处理中生成集成时间线文件,并将其存储在集成重新估计配置文件中:和1,2重新仿真使用时间线文件进行分析,并且预设增加/减少处理值在第一时间线文件的经过时间的经过时间的指数移动平均值中连续地反映,以预测数据延迟期间可能发生的错误和数据集中。包括步骤5,第一时间线文件的经过时间的特征在于,在接收到传感器数据1并且接收到连续传感器数据2的所需时间被视为经过的时间。

著录项

  • 公开/公告号KR102237057B1

    专利类型

  • 公开/公告日2021-04-07

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR1020190110754

  • 发明设计人 박경수;

    申请日2019-09-06

  • 分类号G06F16/21;G06F16/11;G06F21/60;G06F30;H04L29/08;

  • 国家 KR

  • 入库时间 2022-08-24 18:08:02

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号