METHOD FOR CREATING UPPER CROSS-CUT ABUTTING JOINT OF APPROACH TUNNEL TO EXISTING METROPOLITAN PILOT STATION CONSTRUCTED WITHOUT INTERRUPTION OF STATION OPERATION

机译:用于创建接近隧道的上交叉切割接头的方法,以便在没有站操作中断的情况下构造的现有大都市试验站

摘要

FIELD: underground construction. ;SUBSTANCE: invention relates to underground construction and can be used when it is necessary to adjoin the approach tunnel to the existing pylon-type deep subway station. Method of creating the upper cross-cut abutting joint of the approach tunnel to the existing metro pylon station, which is being built without interrupting the operation of the station, consists in driving the approach tunnel to the existing metro station with middle and side station tunnels made of preassembled tubing, out of which a cross-cut abutting joint chamber is created, located above the operated side tunnel of the station and containing a crown, side and end walls. Moreover, one of the end walls of the cross-cut chamber rests on a pylon between the middle and side tunnels. The abutting joint is accomplished within the passenger area of the existing pylon-type subway station. Initially, from the approach tunnel, the crown and side walls of the abutting joint chamber are developed and concreted; the chamber is located only above the side tunnel, which is the closest to the approach tunnel. Then, the far end wall of the abutting joint chamber is constructed, while the side walls and the far end wall of the abutting joint chamber rest on the existing pylon located between the middle tunnel and the side tunnel closest to the approach tunnel, and the closed lining loops of the side station tunnel. This is the end wall of the abutting joint chamber, adjacent to the approach tunnel, which is constructed. After the construction of the abutting joint chamber, under protection of the crown and walls of the abutting joint chamber, the tubing of the side station tunnel closest to the approach tunnel is dismantled within the prospective openings. Furthermore, in each open loop of the side tunnel lining from the side of the approach tunnel at the level of the abutting joint chamber buckle plate, support embedded metals are mounted, which serve to transfer normal forces in the open loops of the tunnel lining to the buckle plate of the abutting joint chamber, and the buckle plate of the abutting joint chamber is concreted; then the internal arrangement of the abutting joint chamber is carried out.;EFFECT: reduced volume of construction and concrete work, as well as created reliable structure of the upper abutting joint of the approach tunnel to the existing pylon-type subway station within the passenger area without interrupting the operation of the station.;1 cl, 3 dwg
机译:领域:地下建设。 ;物质:本发明涉及地下结构,并且当需要邻接隧道到现有的幽门型深地铁站时,可以使用。在没有中断车站的运行的情况下,在没有中断车站的情况下建立的方法隧道上部交叉切割接头的方法包括将隧道与中间站隧道的现有地铁站驱动到现有的地铁站。由预先释放的管道制成,其中产生交叉切割邻接接头室,位于车站的操作侧隧道上方并包含冠部,侧面和端壁。此外,交叉腔的一个端壁的一个端壁搁置在中间隧道和侧隧道之间的塔架上。抵接接头是在现有Pylon型地铁站的乘客区域内完成的。最初,从接近隧道,抵壳接合室的冠部和侧壁是开发和混凝土的;腔室仅位于侧隧道之上,这是最接近的方法隧道。然后,构造邻接接头室的远端壁,而邻接接头室的侧壁和远端壁搁置在位于中间隧道和最接近接近隧道的侧隧道之间的现有塔架上,以及侧站隧道的闭合衬里环。这是邻接接合室的端壁,与接近隧道相邻,该隧道构造。在构造邻接接头室之后,在邻接接合室的冠部和壁的保护之后,侧站隧道的管道在预期开口内被拆除。此外,在邻接接合室扣板的侧面的侧隧道的侧隧道的每个开环中,安装了支撑嵌入式金属,其用于在隧道衬里的开口环中传递正常力混凝土接头腔室的扣板和抵接接头室的扣板;然后进行邻接接头室的内部布置。;效果:减少施工和混凝土工作的体积,以及创造了乘客内现有的Pylon型地铁站的现有幽门型地铁站的可靠结构区域不断中断车站的操作。; 1 cl,3 dwg

著录项

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号