Various techniques are used to schedule computing jobs for execution by a computing resource. In an example method, a schedule is generated by selecting, for a first slot in the schedule, a first computing job based on a first priority of the first computing job with respect to a first characteristic. A second computing job is selected for a second slot in the schedule based on a second priority of the second computing job with respect to a second characteristic. The second slot occurs after the first slot in the schedule, and the second characteristic is different than the first characteristic. The first characteristic or the second characteristic includes an execution frequency. The computing jobs are executed based on the schedule.
展开▼