首页> 外国专利> A procedure for the construction of buildings based on large units of its structure, which are manufactured, transferred and mounted mechanically in series (Machine-translation by Google Translate, not legally binding)

A procedure for the construction of buildings based on large units of its structure, which are manufactured, transferred and mounted mechanically in series (Machine-translation by Google Translate, not legally binding)

机译:一种基于建筑的大型单元建造建筑物的过程,这些单元是通过机械方式串联制造,转移和安装的(由Google翻译进行机器翻译,不具有法律约束力)

摘要

A procedure for the construction of buildings based on large units of its structure, which are manufactured, moved and assembled mechanically and in series, characterized by prefabricating completely on site, all the constituent elements of the building to be built, that is, the exterior and interior walls, the roofs and the roof; complete and with their openings already arranged to receive the corresponding doors and windows, conduits of chimneys and drains, according to the corresponding molds and templates; with the pipes of water, gas, electricity, heating, cooling, air conditioning and drains completely embedded in such elements; with their thermal insulation linings already adhered to their internal walls and, once manufactured, move them to the building site, assembling them neatly, according to the plan of the building, assembling them and joining them with one another; leaving the building ready and complete for its interior and exterior painting, and for the simple rear assembly of the kitchens, sinks, washbasins, lamps, radiators and others; concurring, for the success of all this, in this procedure, jointly and in combination, the following fundamental conditions: a) the use of an accelerator for the setting of concrete, which allows reducing the molding times of these large panels in the eras located adjacent to the building site; b) the use of a powerful crane detachable, movable gantry rail gantry height adjustable and enough to cover the total width and height of the building to build dimensions; c) the provision that when arranging the metal ribs required by the calculation of loads and resistances of each piece, it is foreseen to have rings protruding outside the walls of the piece, if it is horizontal or of its edges if the piece is vertical, that facilitate their fastening by the hooks of a spider in the horizontal elements, or by their upper horizontal edges if the piece is vertical, to thread in these rings a suspension bar linked to the chain or cable of the hoist or crane; d) the use of a highly accurate rig to ensure the verticality of the walls, when placed on site and to maintain it during the operations of linking them to each other by armed chains. (Machine-translation by Google Translate, not legally binding)
机译:一种基于建筑物的大型结构体的建筑物的建造过程,这些结构体是机械地,串联地制造,移动和组装的,其特征在于,在现场完全预制要建造建筑物的所有构成要素,即外部内墙,屋顶和屋顶;完整且已按照相应的模具和模板将其开口布置成容纳相应的门窗,烟囱和排水管的导管;水,气,电,暖气,冷却,空调和排水管完全嵌入这些元件中;它们的隔热衬里已经粘附在其内壁上,一旦制造出来,就将它们移到建筑工地,按照建筑的计划将它们整齐地组装起来,进行组装并将它们彼此连接;为建筑物的内部和外部油漆以及厨房,水槽,洗脸池,灯,散热器等的简单后部装配做好准备和完整;为了使所有这些工作成功,在此过程中,要结合起来使用以下基本条件:a)使用促进剂来凝固混凝土,这可以减少在所处时代中这些大型面板的成型时间毗邻建筑工地; b)使用功能强大的可拆卸起重机,可移动的龙门轨道龙门高度可调,并足以覆盖建筑物的总宽度和高度,以建造尺寸; c)规定在安排计算每块的载荷和电阻所需的金属肋时,如果水平或垂直,则环的边缘应突出于其壁的外部,通过蜘蛛钩在水平元件上,或在其垂直的情况下通过其上部水平边缘,便于将它们固定在这些环上,以将悬挂杆穿入到吊环或起重机的链或缆绳上; d)使用高度精确的钻机以确保墙壁在现场放置时的垂直度,并在通过武装链条将墙壁彼此连接的操作过程中进行维护。 (通过Google翻译进行机器翻译,没有法律约束力)

著录项

  • 公开/公告号ES229718A3

    专利类型

  • 公开/公告日1957-03-01

    原文格式PDF

  • 申请/专利权人 PADRO VILA JOSE MARIA;

    申请/专利号ES19560229718

  • 发明设计人

    申请日1956-07-04

  • 分类号1E04A;

  • 国家 ES

  • 入库时间 2022-08-23 22:38:13

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号