首页> 外国专利> Procedure and constructive unit for the entibation of tunnels and galleries. (Machine-translation by Google Translate, not legally binding)

Procedure and constructive unit for the entibation of tunnels and galleries. (Machine-translation by Google Translate, not legally binding)

机译:隧道和画廊引人入胜的程序和建设单位。 (通过Google翻译进行机器翻译,没有法律约束力)

摘要

Procedure for the shoring of tunnels and galleries by means of a lost formwork of constructive elements based on tables, which rest on some arches of formwork, and which have a series of bridges, that form with the concrete a homogeneous unión and that go curving alternately towards opposite sides, while the hollow enclosure that must receive the concrete and that must be filled in its later part, with simultaneous propping of the ceiling of the tunnel or of the gallery, is supported by transverse supports in correspondence to the profile of opening by means of spears they can be advanced, mainly by hydraulics, of the hollow type, which slide on guide arches and which are interconnected in loose form and articulated by their longitudinal sides, establishing this support towards the side of the mountain, while each time in that section of tunnel already provided with concrete and filled in its back part, this hollow enclosure is connected to its free of the last constructive element based on tables, and is provided with concrete and filled in its back, progressively from behind, by sections and with the help of an end form, characterized by that before applying the concrete of that section that follows after the reinforced part and provided with concrete of the tunnel and supported by spears and guide arches, until the place of the vertices of the lances, is placed in front of the cut at least the last guide arch and in its place at least one arc of formwork is provided which is provided with constructive elements based on tables, in which at a distance from its front end serving for the coating a front formwork is mounted which extends up to the coating of the lance and because after applying the concrete, the hollow enclosure created between the concrete and the mountain due to the advance of the lances is filled in its back by means of some filling material under for example, "trass", ash concrete, sand, crushed gravel or similar material, which is transported through the hollow lances. (Machine-translation by Google Translate, not legally binding)
机译:通过丢失基于表格的建筑要素模板支撑隧道和画廊的程序,这些模板位于表格的某些拱门上,并具有一系列的桥梁,这些桥梁与混凝土形成同质的unión并交替弯曲朝向相对的两侧,同时必须支撑混凝土并必须在其后半部分填充的中空外壳,同时支撑隧道或走廊的顶棚,由对应于开口轮廓的横向支撑支撑。长矛可以通过空心型的水力推动,主要是通过水力推动的,它们在导向拱上滑动,并以松散的形式相互连接,并通过其纵向侧面进行铰接,从而在每次进入山体时都建立了支撑。隧道的那部分已经装有混凝土并填充在其后部,该空心围栏连接到没有最后一个建筑构件的地基在桌子上完成,并由混凝土制成,并在其后部,从各个部分开始并借助端模逐渐填充在其背面,其特征在于,在施加该部分的混凝土之前,该部分的混凝土在加强部分之后并由混凝土提供隧道的顶端由矛和导向拱支撑,直到喷枪顶点的位置放置在切口的前面,至少是最后一个导向拱,并在其位置提供了至少一个模板弧,该模板弧基于表格的结构性元素,其中在距离用于涂层的前端一定距离处安装了一个前模板,该模板一直延伸到喷枪的涂层,并且由于在施加混凝土之后,在混凝土和山之间形成了空心的外壳由于喷枪的前进,其后部通过一些填充材料填充,例如“ trass”,灰混凝土,沙子,碎石碎石或类似材料,然后通过空心的长矛(通过Google翻译进行机器翻译,没有法律约束力)

著录项

  • 公开/公告号ES391873A1

    专利类型

  • 公开/公告日1974-06-16

    原文格式PDF

  • 申请/专利权人 P. BERNOLD;WALTER PFEIFFER;

    申请/专利号ES19710391873

  • 发明设计人

    申请日1971-06-03

  • 分类号E01G;

  • 国家 ES

  • 入库时间 2022-08-23 05:59:17