首页> 外国专利> Conveyor track layout for casting zone in steelworks - using separate stillages moved by bogies fitted with jacks

Conveyor track layout for casting zone in steelworks - using separate stillages moved by bogies fitted with jacks

机译:炼钢厂铸造区的输送机轨道布局-使用装有千斤顶的转向架移动的单独釜馏物

摘要

Layout for improving the material flow in steelworsk,esp. during the assembly and breakdown operations involved in casting, the novelty being the use of =1 parallel conveyor tracks running from the casting platform area to assembly and dismantling stations; bogies run along the tracks and are employed to move independent stillages either along a main track or along several subsidiary tracks located at 90 degrees to the main track. The stillages are pref. used as beds for the bottom pouring plate, downstick and ingot moulds, the bogies being equipped with jacks which raise the stillages off bed-rails located in the factory floor; and the bogies then transport the stillages to the desired position. Method ensures a systematic and smooth flow of ingot mould assemblies past the casting platform and from assembly zones to breakdown zones without the use of cranes.
机译:尤其是在Steelworsk中,用于改善物料流动的布局。在铸造涉及的组装和故障操作过程中,新颖之处在于使用了从铸造平台区域到组装和拆卸站的> = 1条平行输送机轨道;转向架沿轨道运行,并用于沿主轨道或与主轨道成90度角的几个辅助轨道移动独立的釜馏物。这些酒是最好的。转向架配有千斤顶,可将底部馏分从工厂车间的床轨上抬起,用作底部浇铸板,下垂和铸锭模的床;转向架随后将釜馏物运送到所需位置。该方法可确保铸锭模具组件在不使用起重机的情况下,能够顺利,平稳地流过铸模平台,并从装配区流向击穿区。

著录项

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号