首页> 外国专利> Building consideration during hydro-electric dam construction - bridging connecting pipes are provided during construction to take away flood water

Building consideration during hydro-electric dam construction - bridging connecting pipes are provided during construction to take away flood water

机译:水力发电大坝施工期间的建筑考虑-施工期间提供了桥接连接管以排走洪水

摘要

Building consideration on erecting an overflowable dam power plant etc. especially a flood power plant with machine halls arranged in the building body and with a number of adjacent power water lines which are set up for the pipe turbines, each with a turbine intermediate chamber and with additional drain lines where emergency connection devices are fitted to the power water lines and there are auxiliary measures for the take-off of the building flood level. Some of the power water lines (7) are temporarily provided with connecting pipes (11) which bridge their turbine intermediate chamber (6). During the further building operations these pipes (11) act to take away the floor water. Specially, the connecting pipes are reinforced concrete pipes.
机译:建筑物考虑,以建立一个可溢流的大坝发电厂等,尤其是一个洪水发电厂,该发电厂在机体内布置了机房,并为管道涡轮机设置了许多相邻的输水管线,每条输水管线都有一个涡轮机中间室,并带有额外的排水管线,其中应急连接装置安装在动力供水管线上,并且有辅助措施来消除建筑物的洪水位。某些输水管线(7)临时设有连接管道(11),这些管道桥接它们的涡轮机中间腔(6)。在进一步的建筑操作中,这些管道(11)用于带走地下水。特别地,连接管是钢筋混凝土管。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号