首页> 外国专利> Mine heading machine balancing - using concrete mix bags placed between broken rock and retracted machine shoes for wetting using water injection lance

Mine heading machine balancing - using concrete mix bags placed between broken rock and retracted machine shoes for wetting using water injection lance

机译:掘进机平衡-使用混凝土混合袋放置在碎石和缩回的机靴之间,使用喷水枪润湿

摘要

Force transmission and balance as between a mine heading machine and the surrounding rock, are obtained by flexible containers filled with a dry concrete mix in the space between the broken rock (4) and retracted machine shoes. The containers fill out the space are wetted either singly or in layers as they are inserted. The containers are then compressed by the extended clamping shoes (2), the full load being applied after a waiting period between 20 and 30 minutes. The mixture should be premix concrete with end strength of 520 kP/cm3. An accelerating agent is mixed with the wetting water continuously, the water being injected into the containers preferably using a lance.
机译:掘进机与周围岩石之间的力传递和平衡是通过在破碎的岩石(4)和缩回的机靴之间的空间中充满干燥混凝土混合物的柔性容器获得的。填充空间的容器在插入时会被单独或分层浸湿。然后,容器将通过延伸的卡瓦(2)进行压缩,在20到30分钟的等待时间后将施加全部负载。该混合物应为最终强度为520 kP / cm3的预拌混凝土。促进剂与润湿水连续混合,优选使用喷枪将水注入到容器中。

著录项

  • 公开/公告号DE2644840A1

    专利类型

  • 公开/公告日1978-04-06

    原文格式PDF

  • 申请/专利权人 RUHRKOHLE AG;

    申请/专利号DE19762644840

  • 发明设计人 HARRYERSWOLFRAMDIPL.-ING.;

    申请日1976-10-05

  • 分类号E21D9/04;

  • 国家 DE

  • 入库时间 2022-08-22 22:00:27

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号