首页> 外国专利> Progressive displacement of residual water past shut-in wells preparatory to tertiary oil recovery

Progressive displacement of residual water past shut-in wells preparatory to tertiary oil recovery

机译:剩余水逐步流经关闭井,为三次采油做准备

摘要

In the oil-bearing formation wherein primary production has been exhausted and secondary recovery by waterflooding is exhausted or about exhausted, the residual brine is removed by progressive displacement. In this displacement a centrally disposed injection well or, preferably, lineal injection wells are utilized for the initial injection of preflush fluid with the immediately adjacent production and/or injection wells being shut in. After a specified slug of preflush has been injected, a series of chemical slugs is injected followed by drive fluid. After displacement of the residual brine has been effected out past the adjacent shutin wells, as evidenced by the arrival of the preflush, they are utilized as production wells. After oil sweep to these wells is complete, they are used as injection wells and the procedure is moved another step outward.
机译:在一次开采已经用尽并且注水二次开采已经用尽或大约用尽的含油地层中,通过逐步驱替除去了残留的盐水。在该位移中,将中央布置的注入井,或者最好是线性注入井用于初次注入预冲洗流体,同时关闭紧邻的生产井和/或注入井。在注入规定的预冲洗段之后,进行一系列注水。注入化学团块,然后注入驱动液。在残留的盐水通过相邻的封闭井排出之后,如预冲洗液的到达所证明的那样,它们被用作生产井。完成对这些油井的扫油后,将它们用作注入油井,然后将操作步骤再往外移。

著录项

  • 公开/公告号US4085797A

    专利类型

  • 公开/公告日1978-04-25

    原文格式PDF

  • 申请/专利权人 PHILLIPS PETROLEUM COMPANY;

    申请/专利号US19760752951

  • 发明设计人 JOSEPH C. TRANTHAM;ROBERT F. MELDAU;

    申请日1976-12-22

  • 分类号E21B43/22;

  • 国家 US

  • 入库时间 2022-08-22 21:30:25

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号