首页> 外国专利> Underground tunnel section making system - leaves frozen gaps for dry excavation and ground water flow

Underground tunnel section making system - leaves frozen gaps for dry excavation and ground water flow

机译:地下隧道断面制作系统-留下冻结的缝隙,用于干挖和地下水流

摘要

The ground is excavated below ground water strata. The dry trench is filled after completion of tunnel and ground water movement path is opened. This system can be used for any construction depth and water movement is readily ensured. The construction is installed at first with concrete wall sections with gaps which are filled with frozen filling material. The excavation is completed subsequently and the frozen wall sections ensure full depth of construction. The ground water movement is freed subsequently when the frozen filling has thawed.
机译:在地下水层以下挖掘地面。隧道完工后干沟被填满,地下水运动路径被打开。该系统可用于任何施工深度,并且易于确保水的流动。该结构首先安装有带有间隙的混凝土墙段,这些间隙用冷冻的填充材料填充。开挖随后完成,冻结的墙壁确保了整个施工深度。冻结的填充物解冻后,地下水运动随后释放。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号