首页>
外国专利>
INTERMEDIATE WALL BODY-UPPER FIXING-TYPE CONSTRUCTION METHOD OF THREE-ARCH EXCAVATION TUNNEL LINING, FOR FACILITATING CONSTRUCTION AND FOR EFFECTIVELY DISCHARGING UNDERGROUND WATER OF ADJACENT GROUND
INTERMEDIATE WALL BODY-UPPER FIXING-TYPE CONSTRUCTION METHOD OF THREE-ARCH EXCAVATION TUNNEL LINING, FOR FACILITATING CONSTRUCTION AND FOR EFFECTIVELY DISCHARGING UNDERGROUND WATER OF ADJACENT GROUND
展开▼
机译:三拱基坑隧道衬砌的中间墙体上部固定式施工方法,以利于施工和有效地排泄相邻地面的地下水
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: An intermediate wall body-upper fixing-type construction method of a three-arch excavation tunnel lining is provided to reduce the occupied area of a road by narrowing the spaced distance between tunnels and to reduce the construction cost and a term of works. CONSTITUTION: In an intermediate wall body-upper fixing-type construction method of a three-arch excavation tunnel lining, lining concrete is placed to the upper side of an intermediate wall body(20) and the thickness of the lower part of the intermediate wall body is reduced to the extent of the thickness of the lining concrete. The lower part of the intermediate wall body is formed in one of a pillar shape, an arch shape, and a wall shape.
展开▼