首页>
外国专利>
PROCEDURE AND ARRANGEMENT FOR LAYING THE FOUNDATION OF PREFABRICATED PLANTS ASHORE
PROCEDURE AND ARRANGEMENT FOR LAYING THE FOUNDATION OF PREFABRICATED PLANTS ASHORE
展开▼
机译:预制植物灰渣基础铺设的程序和安排
展开▼
页面导航
摘要
著录项
相似文献
摘要
Procedure and arrangement for laying the foundation of prefabricated plants (7) comprising such types as processing plants, industrial buildings, hospitals, hotels, etc., and for their removal, assembly and foundation building at the place of destination (10) ashore. Foundations (4) are made ashore or in a dry dock or on a barge, after which the processing plant is assembled. If the foundation is manufactured outside the barge (1), the plant (7) and/or foundation (4) can be moved to transport barges (1). Transport to the place of destination is carried out by means of sea-going transport barges (1). At the place of destination (9) the transport barges (1) are lowered onto an erection bed (2), and the plant (7) is launched over prefabricated sliding supports (5) from transport barge to the definitive erection site (10), which can advantageously be situated above the water level in the vicinity of the beach (9) or ashore.
展开▼