首页> 外国专利> Tunnel wall erection procedure - has wall divided by continuous seams filled with consolidating substance permitting movement for balanced condition

Tunnel wall erection procedure - has wall divided by continuous seams filled with consolidating substance permitting movement for balanced condition

机译:隧道墙的安装程序-墙被连续的接缝分隔开,并充满固结物质,允许在平衡状态下移动

摘要

The wall construction erection procedure is specially for tunnel walls, which in the load condition are exposed to forces which influence shape and position changes through the wall construction. The space i.e. the seam between the back wall of the construction and the soil is filled in with a consolidating substance. - The wall construction is split up by corresponding continuous seams and these are filled with the consolidating substance in suitable amounts. These can be a relative movement of the components until the wall construction is in a roughly balanced condition. The seams are then closed off at their open ends by the natural consolidation of the consolidating layer.
机译:墙体结构的安装过程特别适用于隧道墙,在荷载条件下,隧道墙体承受力,这些力会影响墙体结构的形状和位置变化。在建筑物的后壁和土壤之间的接缝(即接缝)中填充了固结物质。 -墙壁结构由相应的连续接缝分开,并以适当的量填充固结物质。这些可以是组件的相对运动,直到壁结构处于大致平衡的状态。然后通过固结层的自然固结来封闭接缝的开口端。

著录项

  • 公开/公告号DE2055955C3

    专利类型

  • 公开/公告日1980-06-19

    原文格式PDF

  • 申请/专利权人 UT- VASUTTERVEZOE VALLALAT BUDAPEST;

    申请/专利号DE19702055955

  • 发明设计人 BALOGH JOZSEF DIPL.-ING. BUDAPEST;

    申请日1970-11-13

  • 分类号E02B3/16;E01C11/02;E02D31/02;E21D11/38;

  • 国家 DE

  • 入库时间 2022-08-22 17:43:30

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号