首页> 外国专利> Driving shallow road tunnel under built up areas - involves driving in tension release tubes, then excavating between them

Driving shallow road tunnel under built up areas - involves driving in tension release tubes, then excavating between them

机译:在已建成的区域内行驶浅层公路隧道-涉及在张力释放管中行驶,然后在它们之间进行挖掘

摘要

The tunnel excavation process produces min. disturbance and vibration. It enables tunnels, esp. road tunnels to be driven in urban or built-up environments with only slight rock overlayering. One or more separate tension-release tubes (1) are first driven into the rock face. The residual rock between them is then excavated in the usual way by drilling and explosive charges. The tubes may be made by the full cutting process. Their overall cross-section can amount to as much as 50% of the whole excavation cross-section.
机译:隧道开挖过程产生最小的。干扰和振动。尤其是启用隧道。仅在岩石覆盖层很小的情况下在城市或人为密集的环境中行驶的公路隧道。首先将一个或多个单独的张力释放管(1)推入岩石表面。然后通过钻孔和炸药以通常的方式挖掘它们之间的残留岩石。这些管可以通过完全切割工艺制成。它们的整体横截面可占整个挖掘横截面的50%。

著录项

  • 公开/公告号DE3000440A1

    专利类型

  • 公开/公告日1981-07-09

    原文格式PDF

  • 申请/专利权人 THYSSEN SCHACHTBAU GMBH;

    申请/专利号DE19803000440

  • 发明设计人 LEBACHDR.RER.OEC.ROLF;

    申请日1980-01-08

  • 分类号E21D9/00;

  • 国家 DE

  • 入库时间 2022-08-22 15:13:04

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号