首页> 外国专利> Quay wall for canal wall construction - uses lost coffering in successive layers with reinforcements compacted in two stages

Quay wall for canal wall construction - uses lost coffering in successive layers with reinforcements compacted in two stages

机译:运河墙的码头墙-在连续的层中使用失去的围堰,并分两阶段压实钢筋

摘要

The technique is for the erection of works under water or in the air, such as quay walls, canal and basin facings or support walls. Sections are laid one above the other, of building material. Between each layer a reinforcement of cross members is and incorporated to a coffering which rises with the structure. The reinforcement is bonded and damage to the coffering prevented by putting each layer down in two stages. In the first stage, a band against the coffering all round, is left until the centre section has set. The border is then cast and compacted to a lesser degree.
机译:该技术用于在水下或空中安装工程,例如码头墙,运河和面盆饰面或支撑墙。建筑材料的各个部分相互叠放。在每一层之间,横向构件的加强被并入到随该结构而升高的保险箱中。加固层被粘合在一起,通过分两阶段放下每一层,可以防止对保险箱的损坏。在第一个阶段中,留出一条环绕整个保险箱的带子,直到中央部分固定好为止。然后将边界浇铸并压实到较小程度。

著录项

  • 公开/公告号FR2377482B1

    专利类型

  • 公开/公告日1982-04-16

    原文格式PDF

  • 申请/专利权人 SETEC GEOTECHNIQUE;

    申请/专利号FR19770001154

  • 发明设计人

    申请日1977-01-17

  • 分类号E02B3/04;E02D29/02;

  • 国家 FR

  • 入库时间 2022-08-22 12:31:56

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号