System for metering and film packaging of bitumen and like materials

机译:沥青和类似材料的计量和薄膜包装系统

摘要

A system for metering and film packaging of bitumen and like materials that are solid at room temperature and molten liquid when heated. The packaging film is thermoplastic, having a melting point not exceeding the temperature of molten bitumen. The material of the packaging film in liquid form is compatible with bitumen without deleteriously affecting the characteristics of the bitumen. In the system, bitumen in a hot molten state is pumped at a filling station into empty molds that are lined with release material. The fluid bitumen is metered at the filling station to supply a predetermined quantity in each mold. The filled molds are conveyed through a lengthy cooling station that may include a water bath and after a suitable time, e.g. 2 to 4 hours, the bitumen solidifies into slabs. The individual molds are comprised of multiple sections including a removable bottom and side walls that can shift from a closed mold-defining position to a discharge position in which the side walls are spaced apart sufficiently to permit the solidified slab to leave downwardly through an open bottom. The system includes an ejection station at which the molds are successively opened and the bottoms momentarily removed to permit pushers to force the slabs downwardly out of the molds onto a conveyor that leads the slabs to a wrapping station at which the cooled solidified slabs are packaged in a biaxially oriented stretched heat-shrinkable thermoplastic film. Thereafter the enveloped slabs are transported through a shrink tunnel to contract the wrapped film tautly about the slab. Next the shrink-wrapped slabs are stacked on pallets ready for shipment. The molds from which the slabs were discharged are closed, the bottoms reapplied and the molds are recycled.
机译:一种用于计量和薄膜包装沥青及类似材料的系统,该材料在室温下为固体,在加热时为熔融液体。包装膜是热塑性的,其熔点不超过熔融沥青的温度。液态包装膜的材料与沥青相容,而不会有害地影响沥青的特性。在该系统中,处于熔融状态的沥青在加气站被泵送到衬有脱模材料的空模具中。在填充站对流体沥青进行计量,以在每个模具中供应预定量。填充的模具被输送通过冗长的冷却站,该冷却站可包括水浴,并且在合适的时间之后,例如在冷却时间之后,被冷却。 2至4小时,沥青固化成板状。单个模具由多个部分组成,这些部分包括可移动的底部和侧壁,这些侧壁和侧壁可以从闭合的模具限定位置移至出料位置,在出料位置中,侧壁要充分隔开,以允许凝固的板坯通过敞开的底部向下离开。该系统包括一个顶出工位,在该工位上依次打开模具,并立即移出底部,以允许推动器将板坯向下压出模具到输送机上,该输送机将板坯引导至包装工位,在该工位上将冷却的凝固后的板坯包装在其中。双轴取向拉伸热收缩热塑性薄膜。此后,将包封的厚板运输通过收缩隧道,以使包封的薄膜在厚板周围绷紧。接下来,将收缩包装的平板堆放在托盘上,以备装运。关闭从中排出板坯的模具,重新涂覆底部并回收模具。

著录项

  • 公开/公告号US4306657A

    专利类型

  • 公开/公告日1981-12-22

    原文格式PDF

  • 申请/专利权人 LEVY;GIORGIO;

    申请/专利号US19780963407

  • 发明设计人 GIORGIO LEVY;

    申请日1978-11-24

  • 分类号B65D85/00;

  • 国家 US

  • 入库时间 2022-08-22 12:16:03