首页> 外国专利> Method of constructing underpass across railway and highway without affecting normal traffic thereof

Method of constructing underpass across railway and highway without affecting normal traffic thereof

机译:在铁路和公路上建造不影响其正常交通的地下通道的方法

摘要

A method of constructing underpass across railway and highway includes the steps of excavating a traction ditch on one side of the road foundation and a launching ditch on the other; building a traction wall with traction holes therein against the road foundation in the traction ditch; and sequentially tracting a precast box culvert one after another through perforating, anchoring and jack driving according to the construction line until a predetermined configuration is completed thereat. Subsequently, build pier foundations, supports, and a bridging beam; arrange shell pipes; place PC steel reinforcements; and, after a certain curing period, perform prestress operations in the precast box culverts of the structure and grout cement mortar therein. Finally, excavate the earth volume under the structure and finish the road surface of the underpass for opening to traffic.
机译:一种跨铁路和公路的地下通道的建造方法,包括在道路基础的一侧开挖牵引沟,在另一侧开挖引水沟的步骤。在牵引沟内的道路基础上建造一个牵引壁,在牵引壁上设有牵引孔;然后根据施工线,依次通过打孔,锚固和千斤顶驱动依次牵引预制箱涵,直到在此完成预定的构造。随后,建造墩台基础,支撑和桥接梁;安排壳管;放置PC钢筋;在一定的固化时间后,在结构的预制箱涵中进行预应力操作,并在其中浇注水泥砂浆。最后,挖掘结构下方的土层,并完成地下通道的路面以供通行。

著录项

  • 公开/公告号US4405260A

    专利类型

  • 公开/公告日1983-09-20

    原文格式PDF

  • 申请/专利权人 TSAI;TEPIN;TSAI;TEH-CHUNG;

    申请/专利号US19810275771

  • 发明设计人 TEH-CHUNG TSAI;TEPIN TSAI;

    申请日1981-06-22

  • 分类号E21D9/00;

  • 国家 US

  • 入库时间 2022-08-22 09:48:49

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号