首页> 外国专利> METHOD OF BURRYING OUTLET PIPING IN CONCRETE DAM

METHOD OF BURRYING OUTLET PIPING IN CONCRETE DAM

机译:在混凝土坝中埋入管道的方法

摘要

PURPOSE:To form a gap in a bottom of an outlet work body and to enable to perform a reliable implantation of grout, by a method wherein a wire net is placed halfway between a bottom of an outlet work body and a lower end of a web, and in parallel to the bottom of the outlet work body, and baseboards are situated to the opposite ends of the web. CONSTITUTION:A wire net 7 is located halfway between a bottom 2 of an outlet work body 1 and a lower end 5 of a web 4 and in parallel to the bottom 2 of the outlet work body 1, and baseboards 8 and 8' are attached to opposite ends 6 and 6', respectively, of the web 4. The outlet work is installed on a driving surface X-X of lift concrete A by means of a support 13. Lift concrete B is then placed. A gap 11 between the bottom 2 of the outlet work body 1 and the lift concrete B firstly placed is filled with grout C implanted through gaps 12 and 12' between both side boards 3 and 3' and baseboards 8 and 8' of the outlet work body 1. Life concrete is then deposited, in order, to bury the outlet work.
机译:目的:通过一种方法将金属丝网放置在出口工作主体底部和腹板下端之间的中间位置,从而在出口工作主体底部形成间隙并能够可靠地进行灌浆。 ,并平行于出口工作主体的底部,踢脚板位于腹板的相对两端。组成:金属丝网7位于出口主体1的底部2与腹板4的下端5之间的中间位置,并平行于出口主体1的底部2,并固定有踢脚线8和8'分别在网4的相对端6和6'上。将出口工件借助于支撑件13安装在提升混凝土A的驱动表面XX上。然后放置提升混凝土B。在出料室主体1的底部2和首先放置的提升混凝土B之间的间隙11中填充有灌浆C,该灌浆C通过在出料室的侧板3和3'与底板8和8'之间的间隙12和12'注入主体1.然后浇筑生活混凝土,以掩埋出水口工作。

著录项

  • 公开/公告号JPS5920804B2

    专利类型

  • 公开/公告日1984-05-15

    原文格式PDF

  • 申请/专利权人 NITSUSO MASUTAABIRUDAAZU KK;

    申请/专利号JP19810153508

  • 发明设计人 ASE MASAAKI;SHIMAGUCHI NORIAKI;

    申请日1981-09-28

  • 分类号E03F3/06;E02B7/00;E02B7/02;E02B8/00;E02B9/00;

  • 国家 JP

  • 入库时间 2022-08-22 09:46:59

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号