首页> 外国专利> ARRANGEMENT FOR CASTING IN SECTIONS OF A PRESTRESSED CONCRETE BRIDGE IN ACCORDANCE WITH THE CANTILEVER CONSTRUCTION METHOD

ARRANGEMENT FOR CASTING IN SECTIONS OF A PRESTRESSED CONCRETE BRIDGE IN ACCORDANCE WITH THE CANTILEVER CONSTRUCTION METHOD

机译:按照悬臂施工方法在预应力混凝土桥梁中浇筑型材的布置

摘要

The arrangement comprises one or several casting carriages (3) with front and back runners (5, 15) which co-operate with traversing rails (2, 2a, 2b) and a previously cast bridge section (1). The rear runners abut the underside of the traversing rails. The rear section (23) of the casting carriage is anchored in traversing trolleys equipped with runners (15). The rear section of the casting carriage is linked with runner trolleys by means of a parallelepiped-shaped frame (28-30) with joints in all four corners so arranged that the frame can be swung out laterally about its two lower joint axes (26, 27) (figs. 1 and 3). In order to stabilise the casting carriage a tensioning device is provided between the rear section (23, 30, 33) of the casting carriage and the previously cast concrete bridge section (1, 18), the said tensioning device being capable of regulation in height and intended for prestressing the tie-rods (38) which are fixed between the bridge deck (18) an a part (30) of the casting carriage's rear section (23) (Fig. 4). For casting in sections of concrete bridges from a bridge pier with superimposed bridge head by way of anchoring section using two casting carriages traversing in opposite directions, which however to begin with are partly dismantled and linked with one another, the arrangement comprises for linking the forward front sections (122) of the casting carriages two substantially plane coupling frames (150) which extend between the front sections (122) their distance from one another corresponding to the gauge of the traversing rails. Each coupling frame has an upper and a lower substantially horizontal flange (151-154) of adjustable length, and the flanges are linked with one another by means of diagonal threaded tie-rods (157, 158) the length of which is also adjustable.
机译:该装置包括一个或多个带有前,后浇道(5、15)的浇铸车(3),它们与横梁(2、2a,2b)和先前浇铸的桥段(1)配合。后部滑行器邻接横梁的底侧。铸车的后部(23)固定在配备有流道(15)的横行小车中。铸车的后部通过平行四面体形的框架(28-30)与浇铸小车相连,框架的所有四个角都有接头,因此可以将框架围绕其两个下部接头轴线(26, 27)(图1和3)。为了使浇铸车架稳定,在浇铸车架的后部部分(23、30、33)和先前浇铸的混凝土桥架部分(1、18)之间设有张紧装置,所述张紧装置能够调节高度并用于对拉杆(38)施加预应力,这些拉杆固定在桥面板(18)和浇铸车后部(23)的一部分(30)之间(图4)。为了从具有叠置桥头的桥墩通过锚固段使用两个在相反方向上横穿的铸造车厢进行混凝土桥梁的铸造,然而,该铸造车厢首先被部分地拆除并彼此连接,该装置包括用于将前部连接起来的装置。铸车的前部(122)的两个基本为平面的连接框架(150)在前部(122)之间延伸,它们之间的距离对应于横梁的规格。每个联接框架具有可调节长度的上部和下部基本水平的凸缘(151-154),并且所述凸缘通过对角螺纹连接杆(157、158)彼此连接,所述对角螺纹连接杆的长度也可调节。

著录项

  • 公开/公告号NO150289B

    专利类型

  • 公开/公告日1984-06-12

    原文格式PDF

  • 申请/专利权人 OESTLANDSKE SPENNBETONG AS;

    申请/专利号NO19820001820

  • 发明设计人 SEMB OSCAR;ARNTZEN ARNE;

    申请日1982-06-01

  • 分类号E01D21/00;E01D21/02;E04G3/00;

  • 国家 NO

  • 入库时间 2022-08-22 09:15:45