In the procedure for mounting of wall- and flooring material in damp rooms and the like, where the floor material (1) extends a distance up the wall (3), and where its upper edge part (4) is overlapped by wall material (12), a strip (5) is used which after installation of the flooring material and fastening of its edge part (4) to the wall (3) is fixed to the edge part's upper section. The strip (5) sticks down a bit on the edge part (4) and lays on top of this against the wall (3). After this the wall material (12) is fixed to the wall (3) and along the strip (5).IMAGE
展开▼