首页> 外国专利> METHOD AND DEVICE USING SPECIAL TOOLS FOR OPERATIONS SUCH AS TAKING MEASURES IN PORTIONS OF BORE-WELLS SHARPLY INCLINED OR HORIZONTAL

METHOD AND DEVICE USING SPECIAL TOOLS FOR OPERATIONS SUCH AS TAKING MEASURES IN PORTIONS OF BORE-WELLS SHARPLY INCLINED OR HORIZONTAL

机译:使用特殊工具进行作业的方法和设备,例如在井斜或水平井的部分中采取的措施

摘要

ABSTRACT OF THE DISCLOSURE: Method for performing predetermined operations of logging or intervention in a zone of a wellbore having from the surface an initial portion followed by an inclined or horizon-tale portion, said predetermined zone being located beyond of the initial portion of the well. The method comprises the steps of: down into said well a tubing string already equipped at its lower end of a tool body fixed to this end, this assembly being lowered into the well until the body of tool reaches said predetermined area; is lowered in the drill string a connector attached to the lower end of a cable, said connector connecting said tool body, said cable sliding through a member that is fixed to the drill string, and moves the tool body through said predetermined area by adding or removing additional rods to the drill string, over that body. And a device to implement this method.
机译:公开内容的摘要:一种用于在井眼区域中进行测井或干预的预定操作的方法,该井眼区域具有从地面开始的初始部分,随后是倾斜或水平的部分,所述预定区域位于井的初始部分之外。 。该方法包括以下步骤:将已经在固定于该端的工具主体的下端处已经配备的管柱向下放入所述井中,将该组件降低到井中,直到工具主体到达所述预定区域为止;在钻柱中降低一个连接器,该连接器连接到电缆的下端,所述连接器连接所述工具主体,所述电缆滑动通过固定在钻柱上的部件,并通过增加或移动工具主体通过所述预定区域移去该钻柱上方的其他杆。并实现该方法的设备。

著录项

  • 公开/公告号CA1193541A

    专利类型

  • 公开/公告日1985-09-17

    原文格式PDF

  • 申请/专利权人 INSTITUT FRANCAIS DU PETROLE;

    申请/专利号CA19820398290

  • 发明设计人 WITTRISCH CHRISTIAN;

    申请日1982-03-12

  • 分类号E21B23/08;

  • 国家 CA

  • 入库时间 2022-08-22 08:05:06

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号