首页> 外国专利> FREMGANGSMAATE FOR ESTIMERING AV EN PARAMETER SOM GJELDER POROESITET OG/ELLER PERMEABILITET I EN GRUNNFORMASJON

FREMGANGSMAATE FOR ESTIMERING AV EN PARAMETER SOM GJELDER POROESITET OG/ELLER PERMEABILITET I EN GRUNNFORMASJON

机译:估算基本岩层中孔隙度和/或渗透率的参数的程序

摘要

In a drill stem test, a packer is set in the well bore to isolate a potential producing zone. A drill pipe with a down hole valve is fitted through the packer. The pipe is usually partially filled with a liquid column prior to commencement of the test, which essentially comprises opening the valve so that formation fluids can flow into the drill pipe and measuring various parameters associated with the fluid transfer. A method for estimating porosity and/or permeability includes the steps of setting up such a drill stem test wherein flow of formation fluid to a drill pipe may be controlled by a down hole valve, opening the valve to establish a flow, recording flow parameters, and analyzing oscillatory transients in the flow to compute therefrom estimates of porosity and permeability.
机译:在钻杆测试中,将封隔器安装在井眼中以隔离潜在的生产区域。带下孔阀的钻杆穿过封隔器。在开始测试之前,管道通常会被液柱部分填充,该过程主要包括打开阀门,以便地层流体可以流入钻杆并测量与流体传输相关的各种参数。一种估算孔隙度和/或渗透率的方法,包括以下步骤:建立这样的钻杆测试,其中可以通过井下阀控制流向钻杆的地层流体流量,打开该阀以建立流量,记录流量参数,分析流动中的振荡瞬变,以据此计算孔隙率和渗透率。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号