PILING WORK IN NEIGHBORHOOD OF BOUNDARY LINE

机译:边界线附近的桩工程

摘要

PURPOSE:To permit a pile buried in the neighborhood of boundary line of the adjacent ground to be fixed by a method in which a supporter is provided for one end of a reaction-receiving base frame, the central part is fixed to an anchor, and pile is pressed into the ground through a jack on the end side. CONSTITUTION:In fixing a pile buried in the neighborhood of boundary line 55, a reaction-receiving base frame 8 is set on a stand 12, and an anchor 1 with a driver 3 is attached between the boundary side end of the frame 8 and the opposite end side. A jack 22 consisting of an oil-pressure cylinder is set on the opposite end side, and a jack 20 consisting of an oil-pressure cylinder is set between the boundary line 55 side end and the pile 13 to press-in the pile 13 into the ground. The pile in the neighborhood of the boundary line can thus be driven without generating noise, etc.
机译:目的:为使埋在相邻地面边界线附近的桩通过一种方法固定,该方法是在反应接收基础框架的一端提供支撑物,中心部分固定在锚上,通过端部的千斤顶将桩压入地面。构成:在固定埋在边界线55附近的桩时,将可接收反应的基础框架8放置在支架12上,将带有驱动器3的锚1固定在框架8的边界侧端与框架之间。另一端。在相反端侧设置有由油压缸构成的千斤顶22,在边界线55侧端与桩13之间设置有由油压缸构成的千斤顶20,以将桩13压入地面。因此可以在不产生噪声等的情况下打入边界线附近的桩。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号