首页> 外国专利> Oil or gas well workover technique

Oil or gas well workover technique

机译:油气井修井技术

摘要

A hydrocarbon producing well is worked over by wire line tools only to run a jet pump into the tubing string by perforating the tubing string and then isolating the perforation to direct power fluid injected down the annulus to pass into the power fluid inlet of the jet pump. Formation fluids delivered up the tubing string pass through the jet pump to the surface. The jet pump is placed in the well without tripping the tubing string and consequently without having to use a workover rig.
机译:碳氢化合物生产井通过钢丝绳工具进行维修,仅通过对油管柱打孔,然后隔离射孔,将注入井下的动力流体引导到环空中,从而将射流泵运行到油管柱中,从而进入射流泵的动力油入口。沿油管柱向上输送的地层流体通过喷射泵到达地面。喷射泵被放置在井中而不会使油管柱跳动,因此无需使用修井设备。

著录项

  • 公开/公告号US4716970A

    专利类型

  • 公开/公告日1988-01-05

    原文格式PDF

  • 申请/专利权人 HENNING;FREDDIE L.;

    申请/专利号US19860909919

  • 发明设计人 FREDDIE L. HENNING;

    申请日1986-09-22

  • 分类号E21B43/00;

  • 国家 US

  • 入库时间 2022-08-22 06:49:39

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号