首页>
外国专利>
ENGINEERING METHOD FOR BUILDING TEE GROUND IN GOLF LINKS
ENGINEERING METHOD FOR BUILDING TEE GROUND IN GOLF LINKS
展开▼
机译:在高尔夫球场中构建三通地面的工程方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE:To provide the ground easy to stick a tee by laying a broken stone layer in a recess provided in a predetermined tee ground position and laying a fiber aggregate impregnated with sand and wrapped by an impermeable unwoven cloth on the broken stone layer to fix an artificial lawn on said aggregate. CONSTITUTION:A foundation predetermined to be provided with a tee ground is formed with a recess having an area larger than that A of the tee ground and a depth C. The recess is provided on the bottom with an underground water groove O. Then, a broken stone layer 2 is laid to a certain height in the recess and a impermeable unwoven cloth 3 is laid on the layer 2. Next, a fiber aggregate 4 filed with 80-99% voids sand is laid uniformly in the central portion of the unwoven cloth 3 on the tee ground A and the peripheral portions of the unwoven cloth 3 are folded to cover the peripheral portions of the aggregate 4. After an artificial lawn 5 is laid on the fiber aggregate 4, the peripheral portions of the artificial lawn 5 are embedded in earth and sand or the like 6. Thus, the tee can be easily stuck into the tee ground.
展开▼