首页> 外国专利> LOOP OPERATION JUDGING SYSTEM IN POWER SYSTEM OPERATION

LOOP OPERATION JUDGING SYSTEM IN POWER SYSTEM OPERATION

机译:电力系统运行中的回路运行判断系统

摘要

PURPOSE:To perform recovery operation from system fault in short time, by automatically judging whether a switchgear is operated in loop or not based on the variation of the number of branches connecting between different node groups and the existence of a path connecting between the node groups through another node group, thereby determining the operational order immediately. CONSTITUTION:When a circuitbreaker CB 12 is operated from open state to closed state, a new branch BR 6 is produced between node groups ND2 and ND3 and only the branch BR6 connects between the node groups ND2 and ND3. There exists a path starting from the node group ND2 and passing through branches BR1, BR2 and a node group ND1 to reach to the node group ND3. A knowledge base not shown is searched and it is judged that the circuitbreaker CB12 is closed through loop throw-in operation. By such arrangement, operational order is determined immediately and system fault can be recovered in short time.
机译:目的:通过根据不同节点组之间连接的分支数量的变化以及节点组之间连接的路径的存在情况自动判断开关设备是否循环运行,以在短时间内从系统故障中执行恢复操作通过另一个节点组,从而立即确定操作顺序。组成:断路器CB 12从断开状态运行到闭合状态时,在节点组ND2和ND3之间产生了一个新的分支BR 6,只有分支BR6在节点组ND2和ND3之间连接。存在一条从节点组ND2开始并经过分支BR1,BR2和节点组ND1到达节点组ND3的路径。搜索未示出的知识库,并通过回路投入操作判断断路器CB12已闭合。通过这种布置,可以立即确定操作顺序,并且可以在短时间内恢复系统故障。

著录项

  • 公开/公告号JPH01274623A

    专利类型

  • 公开/公告日1989-11-02

    原文格式PDF

  • 申请/专利权人 MITSUBISHI ELECTRIC CORP;

    申请/专利号JP19880102382

  • 发明设计人 OTANI JUNICHI;

    申请日1988-04-27

  • 分类号H02J3/00;

  • 国家 JP

  • 入库时间 2022-08-22 06:44:50

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号