PURPOSE:To stack ores equally on each side slope of a piled up pile, by dividing the dropping channel of piling ores exactly in two on its route and distributing the ores equally to each side slope at the time of dropping the ores from a stacker boom head. CONSTITUTION:A distributing plate 5 for dividing the turning direction of ore into two is fixed to the inside of the upper part 4a of a shoot body which is located under a boom head, 1a, and opened to the dropping route of ores and, on the other hand, each pressure sensing plate 6, 7 arranged so as to bar a part of a passage allowing ores to pass through is fixed to the inside of each branch part 4b, 4c of the lower part of the shoot body. The pressure sensing plates 6, 7 sense the quantity of ores passing the branch parts as pressure, and when the ores flow in large quantities, large pressure is detected. Then, the shoot body 4 loses its ballance, and turns to the direction in which the sensed pressure is larger. As the result, equal distribution becomes possible.
机译:目的:通过将堆积矿石的下降通道在其路线上精确地一分为二,并在将矿石从堆高机吊臂下降时,将矿石平均分配到每个边坡上,从而在堆积的桩的每个边坡上均等地堆积矿石头。组成:用于将矿石的旋转方向分为两部分的分配板5固定在位于吊杆头1a下方的射出物体的上部4a的内部,并朝着矿石的下落路径敞开。另一方面,布置成禁止一部分矿石通过的通道的每个压力感测板6、7被固定在射击体下部的每个分支部分4b,4c的内部。压力感测板6、7将通过分支部分的矿石的量作为压力感测,并且当矿石大量流动时,检测到较大的压力。然后,射出主体4失去平衡,并转向感测到的压力较大的方向。结果,相等的分布成为可能。

著录项

  • 公开/公告号JPH0127132B2

    专利类型

  • 公开/公告日1989-05-26

    原文格式PDF

  • 申请/专利权人 KAWASAKI STEEL CO;

    申请/专利号JP19810034496

  • 发明设计人 YAMANA SHINICHIRO;NIKO KYOSUKE;

    申请日1981-03-12

  • 分类号B65G65/28;B65G3/02;B65G47/44;B65G47/72;C22B1/00;

  • 国家 JP