首页> 外国专利> METHOD OF HYDROMECHANICALLY BACKFILLING POST-EXPLOITATION AREAS IN PARTICULAR THOSE INVOLING SULFUR MINING THROUGH BORE-HOLES

METHOD OF HYDROMECHANICALLY BACKFILLING POST-EXPLOITATION AREAS IN PARTICULAR THOSE INVOLING SULFUR MINING THROUGH BORE-HOLES

机译:穿过孔的硫磺开采特别是水力机械回采后开采区的方法

摘要

1. Hydromechanical method of silting ground, in particular ground from which sulphur has been mined, using an isolating and filling material, preferably flotation tailings with granularity of up to 1.0 mm, carried out on previously embanked ground using distribution pipelines, characterized in that in the principal directions of the ground being silted (1), drops are made for water to run off from the embankment (3) towards the lowest level, and the distribution pipelines (5), in whose lower part are outflow holes (5a) with differing diameters, are spaced at distances not greater than 80 m from each other, so that the settling cones (12) formed under them do not cause separation of the flotation tailings, but by overlapping with each other gradually fill the ground being silted (1), while the distribution of the flotation tailings starts from the furthest or/and highest point of the ground being silted.IMAGE
机译:1.使用隔离和填充材料(最好是粒度最大为1.0毫米的浮选尾矿),通过分配管道,在以前筑堤的地面上淤泥淤泥的水力机械方法,特别是粒度不超过1.0毫米的浮选尾矿。地面的主要​​方向是淤积的(1),滴水使水从路堤(3)流到最低水位,分配管道(5)的下部是流出孔(5a),带有直径不同,彼此之间的距离不大于80 m,因此在其下方形成的沉降锥(12)不会引起浮选尾矿的分离,而是通过相互重叠逐渐填充正在淤泥的地面(1 ),而浮选尾矿的分布则从淤泥地面的最远或最高点开始。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号