METHOD OF HYDROMECHANICALLY BACKFILLING A LAND IN PARTICULAR THAT AFTER SULFUR MINING THROUGH BORE-HOLES

机译:通过孔进行硫磺开采后对特定土地进行水力机械回填的方法

摘要

1. Hydromechanical method of silting ground, in particular ground from which sulphur has been mined, using an isolating and filling material, preferably flotation tailings with granularity of up to 1.0 mm, carried out on previously embanked ground using distribution pipelines, characterized in that in the principal directions of the ground being silted (1), drops are made for water to run off from the embankment (3) towards the lowest level, and the distribution pipelines (5), in whose lower part are outflow holes (5a) with differing diameters, are spaced at distances not greater than 80 m from each other, so that the settling cones (12) formed under them do not cause separation of the flotation tailings, but by overlapping with each other gradually fill the ground being silted (1), while the distribution of the flotation tailings starts from the furthest or/and highest point of the ground being silted.IMAGE
机译:1.使用隔离和填充材料(最好是粒度不超过1.0毫米的浮选尾矿),通过分配管道在以前筑堤的地面上淤泥淤泥的水力机械方法,特别是粒度不超过1.0毫米的浮选尾矿。地面的主要​​方向是淤积的(1),滴水使水从路堤(3)流到最低水位,分配管道(5)的下部是流出孔(5a),带有直径不同,彼此之间的距离不大于80 m,因此在其下方形成的沉降锥(12)不会引起浮选尾矿的分离,而是通过相互重叠逐渐填充被淤泥的地面(1 ),而浮选尾矿的分布则从淤泥地面的最远或最高点开始。

著录项

  • 公开/公告号PL158713B1

    专利类型

  • 公开/公告日1992-09-30

    原文格式PDF

  • 申请/专利权人

    申请/专利号PL19880272185

  • 发明设计人

    申请日1988-04-29

  • 分类号E02B3/18;

  • 国家 PL

  • 入库时间 2022-08-22 05:34:27