首页> 外国专利> CONTROL METHOD OF EXCAVATION OF BOTTOM EXPANDING SECTION IN CONSTRUCTION OF BOTTOM EXPANDING SHAFT

CONTROL METHOD OF EXCAVATION OF BOTTOM EXPANDING SECTION IN CONSTRUCTION OF BOTTOM EXPANDING SHAFT

机译:底部伸缩井施工中底部伸缩段开挖的控制方法

摘要

PURPOSE:To form the shape of a bottom expanding section accurately according to a design by detecting the lowering depth and expanding width of a shell for expanding a bottom and controlling excavation while being compared with a previously programmed specified excavation pattern. CONSTITUTION:Both sidewalls of the shaft bottom section of a shaft 6 to be excavated are excavated and a bottom expanding section is formed, and concrete is placed, thus constituting a bottom expanding pile. In the method of construction, a shell 10 for expanding a bottom open-close driven by a hydraulic driving plate just above the shaft bottom section is elevated and lowered while biting in specified width to both sidewalls. The lowering depth detecting means 30 of the shell 10 and an oil gage as an expanding width detecting means are mounted at that time, and the depth and expanding width of the leading section of the shell 10 are computed automatically. A hydraulic control means and an elevation and lowering means are driven and controlled while the state is compared with a previously programmed fixed excavation pattern.
机译:目的:通过与先前编程的指定挖掘方式进行比较,通过检测用于扩展底部的壳体的下降深度和扩展宽度,并根据设计,根据设计准确地形成底部扩展部分的形状。构成:将要开挖的竖井6的竖井底部的两个侧壁均开挖,并形成底部扩展部分,并放置混凝土,从而构成底部扩展桩。在该构造方法中,用于使由液压驱动板驱动的底部开闭刚好扩大到轴底部上方的壳体10被升高和降低,同时以特定的宽度咬合到两个侧壁。此时,安装壳体10的下降深度检测装置30和作为扩展宽度检测装置的油尺,并自动计算壳体10的前部的深度和扩展宽度。在将状态与先前编程的固定挖掘方式进行比较的同时,驱动和控制液压控制装置以及升降装置。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号