首页> 外国专利> HEIGHT CONTROL METAL FITTING, CONCRETE MEMBER WITH HEIGHT CONTROL METAL FITTING, AND EXECUTION OF CONCRETE MEMBER

HEIGHT CONTROL METAL FITTING, CONCRETE MEMBER WITH HEIGHT CONTROL METAL FITTING, AND EXECUTION OF CONCRETE MEMBER

机译:高度控制金属装配,具有高度控制金属装配的混凝土构件以及混凝土构件的执行

摘要

PURPOSE:To execute simply and surely by providing a bolt with about a spherical end opposite to the head thereof, nut, washer and female screw section. CONSTITUTION:Foundation cobble stones 21 and foundation concrete 20 are subsequently placed on the foundation ground 22. A washer 3 and nut 4 are fixed on the surface of a hole 2 provided to a bottom slab 1a of concrete members, and about a plate-like free control metal fittings 5 provided with a female screw section 6 is screwed and loaded to the bottom of the hole 2. A bolt 9 with about a spherical end opposite to the head thereof is screwed in the hole 2, and the end of the bolt 9 is placed on a liner plate 12. In addition, after making height control of the concrete member by rotating the bolt 9, filler 10 such as mortar and the like is poured into a space made between the bottom slab 1a and foundation concrete 20 to fill it.
机译:目的:通过提供一个螺栓头,该螺栓的头部与螺母,螺母,垫圈和内螺纹部分相对,其球形末端相对于球形,目的是简单,可靠地执行操作。组成:地基鹅卵石21和地基混凝土20随后放置在地基地面22上。垫圈3和螺母4固定在设置于混凝土构件的底部平板1a上的孔2的表面上,并且围绕板状。将具有阴螺纹部分6的自由控制金属配件5拧紧并装载到孔2的底部。将具有大约相反于其头部的球形端的螺栓9拧入孔2中,并且螺栓的端部将图9所示的垫板放置在衬板12上。另外,在通过旋转螺栓9控制混凝土构件的高度之后,将诸如灰浆等的填充剂10倒入在底部平板1a与基础混凝土20之间形成的空间中。填充。

著录项

  • 公开/公告号JPH02112533A

    专利类型

  • 公开/公告日1990-04-25

    原文格式PDF

  • 申请/专利权人 SASAKI YOJI;

    申请/专利号JP19880266829

  • 发明设计人 SASAKI YOJI;

    申请日1988-10-21

  • 分类号E03F3/06;E02D29/02;E03F5/04;

  • 国家 JP

  • 入库时间 2022-08-22 06:25:05

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号