首页> 外国专利> PUSH-IN METHOD OF REINFORCING IRON CAGE IN DEEP-SEATED MIXING SOLIDIFIED SOIL CONSTRUCTION METHOD

PUSH-IN METHOD OF REINFORCING IRON CAGE IN DEEP-SEATED MIXING SOLIDIFIED SOIL CONSTRUCTION METHOD

机译:深层搅拌固结土施工中钢筋笼的推入法

摘要

PURPOSE:To secure a full adherence between solidified soil and a reinforced member while preventing a buckling of the reinforced member by providing a guide section and a pressure receiving section to the upper- and lower-ends of a reinforcing iron cage and mounting a push-in member on them so that it is capable of loading and unloading. CONSTITUTION:After completing a formation of a soil cement column 1, a reinforcing cage 8 is placed on the periphery of a push-in pipe 6 through a notch 9 thereof in such a state that the push-in pipe 6 is erected through a leader 3 of a truck 2, and a guide plate 6a provided to the tip of the push-in pipe 6 is fitted to a receiving section 12 mounted to the lower end of the reinforcing cage 8 to hold it. The push-in pipe 6 is thrust into the inside of the soil cement column 1 while giving vibration by a vibro-hammer 5, and the push-in pipe 6 is drawn out to bury the reinforcing cage 8 inside the soil cement column 1.
机译:目的:通过在钢筋笼的上端和下端设置导向部分和受压部分,并安装推杆,以确保凝固的土壤与加强件之间完全粘附,同时防止加强件屈曲。在它们上的成员中,以便能够加载和卸载。构成:在完成水泥桩1的成型后,将钢筋笼8穿过其缺口9放置在推入管6的外围,其状态为推入管6穿过引导头竖起在卡车2的图3中,设置在推入管6的前端的导向板6a安装在安装于加强笼8的下端的容纳部12上,以保持该容纳部12。推入管6在通过振动锤5振动的同时被推入土壤水泥柱1的内部,并且将引入管6抽出以将加强笼8埋入土壤水泥柱1内。

著录项

  • 公开/公告号JPH0224413A

    专利类型

  • 公开/公告日1990-01-26

    原文格式PDF

  • 申请/专利权人 OHBAYASHI CORP;

    申请/专利号JP19880172602

  • 申请日1988-07-13

  • 分类号E02D3/12;E02D5/18;E02D5/34;E02D13/04;

  • 国家 JP

  • 入库时间 2022-08-22 06:24:45

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号