首页> 外国专利> STABILIZING METHOD FOR GROUND IN TUNNEL EXCAVATION AND INJECTION PIPE USED THEREIN

STABILIZING METHOD FOR GROUND IN TUNNEL EXCAVATION AND INJECTION PIPE USED THEREIN

机译:隧道开挖中地基的稳定方法

摘要

PURPOSE:To reduce an expense of construction while stabilizing the uniform ground without generating blinding by storing to a water level not less than the groundwater level a grain-size adjusting clay suspension naturally infiltrated into the ground from an injection pipe provided in the face sandy ground. CONSTITUTION:A fixed water level tank 26 is provided in a water level not less than the groundwater level W, storing a classification processed grain-size adjusting clay suspension A. Next, an injection pipe 15 is buried toward a tunnel advancing direction and press inserted to a predetermined length while injecting from a water injecting pipe 17 water washing away grits. Next the liquid A is injected by a head pressure through an injection line 30 into the ground G from an injection pipe main unit 16. In this way, a sufficient amount of clay grains is infiltrated in an unsolidified sandy layer total unit without generating blinding and replaced with water, and an expense of execution can be reduced by a simplified equipment while increasing strength and water stop quality of the ground G, further even excavation can be smoothly executed because the necessity for providing a tunnel equipment is eliminated.
机译:用途:为减少施工费用,同时稳定地面,且不会产生盲目现象,方法是将面容砂土中设置的注入管自然渗入地下,将粒度可调的粘土悬浮液存储到地下水中,地下水高度不低于地下水水位。组成:固定水位箱26的水位不低于地下水水位W,用于存储经过分级处理的粒度调节粘土悬浮液A。接着,将注入管15朝隧道前进方向埋入并压入从注水管17注入预定长度的水,以冲走砂砾。接下来,液体A在头压的作用下通过注入管线30从注入管主体16注入地面G。这样,足够量的粘土颗粒渗透到未固化的沙层总单元中,而不会产生致盲现象。代替水,并且可以通过简化的设备来减少执行费用,同时增加地面G的强度和止水质量,并且由于可以消除提供隧道设备的必要性,因此可以平稳地进行均匀的挖掘。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号