首页>
外国专利>
METHOD OF CONSTRUCTING ANTISEEPAGE SCREEN ELEMENT OF EARTH DAM
METHOD OF CONSTRUCTING ANTISEEPAGE SCREEN ELEMENT OF EARTH DAM
展开▼
机译:构造土坝防渗屏面单元的方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
the invention u043eu0442u043du043eu0441u0438u0442u0441u00a0 to u0433u0438u0434u0440u043eu0442u0435u0445u043du0438u0447u0435u0441u043au043eu043cu0443 construction. the purpose of u0438u0437u043eu0431u0440u0435u0442u0435u043du0438u00a0 - reducing the time u0432u043eu0437u0432u0435u0434u0435u043du0438u00a0, reducing time and cost. manufacture u043du0430u043fu043bu0430u0432u043du044bu0435 blocks 1 in height above the water level in the river.after u043fu0435u0440u0435u043au0440u044bu0442u0438u00a0 riverbed stone banquet u043du0430u043fu043bu0430u0432u043du044bu0435 blocks in u0441u0432u00a0u0437u043au0430u0445 is transported to the place of u043fu0435u0440u0435u043au0440u044bu0442u0438u00a0 set on goal and u043eu0441u0443u0449u0435u0441u0442u0432u043bu00a0u044eu0442 immersion at the u043eu0431u0440u0430u0437u0443u00a0 thus node u0441u043eu043fu0440u00a0u0436u0435u043du0438u00a0 u043eu0441u043du043eu0432u0430u043du0438u00a0 with a diaphragm 3.u0446u0435u043cu0435u043du0442u0430u0446u0438u044e u043eu0441u043du043eu0432u0430u043du0438u00a0 and filling various u043du0435u043fu043bu043eu0442u043du043eu0441u0442u0435u0439 between him and the blocks are in these pipes 2 embedded in the u043du0430u043fu043bu0430u0432u043du044bu0435 blocks 1 with their manufactured ai. at the end of this set of works, the establishment of the diaphragm 3. 2).
展开▼