首页> 外国专利> AUTOMATIC SYSTEM FOR PREPARATION OF REMACHINING SHOP ORDER SCHEDULE

AUTOMATIC SYSTEM FOR PREPARATION OF REMACHINING SHOP ORDER SCHEDULE

机译:用于自动订购车间计划的自动系统

摘要

PURPOSE: To minimize influence exerted on existing orders by simulating confusion of a manufacturing environment generated by the introduction of re-work orders on the basis of a prescribed control reference related to a delay of orders, cycle time and a processing work inventory. CONSTITUTION: Orders containing re-work to optimize a control reference 44 related to a delay, a processing work inventory WIP and cycle time are designated by monitoring orders and a delivery data list 41 from a production release system 30 by a production designating system 42. Next, a common function simulation system 43 is called out, the influence of productional confusion by re-work orders is guessed on the basis of parts list data from the system 30, an user input 47, plan priority order rules and completed operation data and when a former planned quantity and data are not satisfied a revised schedule is re-calculated on the basis of a revised priority order by issuing a prompt to find the user input 47 to complete a work schedule in a block 45. Thus influence exerted on existing orders is minimized.
机译:目的:通过基于与订单延迟,周期时间和加工工作清单有关的规定控制参考,模拟由于引入返工订单而产生的制造环境的混乱,以最大程度地减少对现有订单的影响。组成:包含重做以优化与延迟有关的控制参考44的订单,处理工作清单WIP和周期时间是由生产指定系统42通过监视订单和来自生产发布系统30的交货数据列表41来指定的。接下来,调出通用功能仿真系统43,基于来自系统30的零件清单数据,用户输入47,计划优先顺序规则和已完成的操作数据来猜测返工订单对生产混乱的影响。当不满足先前的计划数量和数据时,在框45中,通过发出提示找到用户输入47以完成工作计划表的提示,根据修改后的优先级顺序重新计算修改后的计划表。订单被最小化。

著录项

  • 公开/公告号JPH03136751A

    专利类型

  • 公开/公告日1991-06-11

    原文格式PDF

  • 申请/专利权人 INTERNATL BUSINESS MACH CORP IBM;

    申请/专利号JP19900241358

  • 发明设计人 BARASU NATARAJIYAN;

    申请日1990-09-13

  • 分类号B23Q41/08;B65G61/00;G05B15/02;G05B19/418;G06Q10/06;H01L21/66;

  • 国家 JP

  • 入库时间 2022-08-22 06:06:42

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号