首页>
外国专利>
PROCEDURE AND HARDWARE FOR USE IN THE CONSTRUCTION OF WASTE WATER PIPES IN THE PALM floors
PROCEDURE AND HARDWARE FOR USE IN THE CONSTRUCTION OF WASTE WATER PIPES IN THE PALM floors
展开▼
机译:棕榈地板废水管道施工中使用的程序和硬件
展开▼
页面导航
摘要
著录项
相似文献
摘要
When laying waste-water pipes in so-called hollow floor structures, a straight waste pipe (6) is fitted with a moulding (12) and a pipe-bend (7, 8) for connection to a waste collecting pipe (4) and to a sanitary appliance respectively. The waste pipe (6) is inserted into a hollow channel (2) in the floor structure (1), with the pipe-bend (7, 8) first, where after pipe-bend (7, 8) is lifted up into a hole drilled from the floor surface down into an underlying hollow channel, and secured in the hole. The sanitary appliance, or apparatus, can then be connected to the pipe-bend (7, 8) and the moulding (12) connected to the collecting pipe (4). The pipe-bend (7, 8) is fixed in the hole at a determined height therein with the aid of a device (18) having the form of an arm of inverse L-shape.
展开▼