首页>
外国专利>
METHOD OF DETERMINING THE DIRECTION OF ADVANCE OF MINING WORK
METHOD OF DETERMINING THE DIRECTION OF ADVANCE OF MINING WORK
展开▼
机译:确定采矿工作超前方向的方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
the invention u043eu0442u043du043eu0441u0438u0442u0441u00a0 to mountain u043fu0440u043eu043cu0435u0442u0438 and m. b. used in the open mining (pi). the improvement in the design of u0443u0441u0440u0435u0434u043du0435u043du0438u00a0 units want to on the other u043du0430u043fu0440u0430u0432u043bu0435u043du0438u00a0u043cu0438 u043fu0440u043eu0441u0442u0438u0440u0430u043du0438u00a0 segments of varying quality. according to the exploration u0441u043eu0441u0442u0430u0432u043bu00a0u044eu0442 quality plan pi block of the ledge.point out the block direction front u043eu0442u0431u043eu0439u043au0438 ledge u0434u043bu00a0 u0432u0437u0440u044bu0432u0430u043du0438u00a0 pi corresponding to the direction u043fu0440u043eu0441u0442u0438u0440u0430u043du0438u00a0 technological classes. on the grid on the u043du0430u043fu0440u0430u0432u043bu0435u043du0438u00a0 front ledge have explosive wells and u0437u0430u0440u00a0u0436u0430u044eu0442 their u0437u0430u0440u00a0u0434u0430u043cu0438 bb. blow up u0441u043au0432u0430u0436u0438 - que u0440u00a0u0434u0430u043cu0438, parallel track technology of pi.u0433u0444u043eu0440u043cu0438u0440u043eu0437u0430u043du043du044bu0439 explosion shattered with u043fu0435u0440u0435u0441u043bu0430u0438u0432u0430u044eu0449u0438u043cu0438u0441u00a0 height of u0441u043bu043eu00a0u043cu0438 technological classes p develop u044du043au0441u043au0430u0432u0430u0442u043eu0440u043du044bu043cu0438 for u0445u043eu0434u043au0430u043cu0438, u043fu0440u043eu0445u043eu0434u0438u043cu044bu043cu0438 vc u0440u0435u0441u0442 u043fu0440u043eu0441u0442u0438u0440u0430u043du0438u00a0 u043du0430u043fu0440u0430u0432u043bu0435u043du0438u00a0 front u043eu0442u0431u043eu0439u043au0438 ledge, u043eu0442u0433u0440u0443u0436u0430u044eu0442 vehicles and transport the mass beyond the career. 4). i
展开▼