首页>
外国专利>
ANTISEEPAGE DIAPHRAGM OF EARTH DAM AND METHOD OF ITS CONSTRUCTION
ANTISEEPAGE DIAPHRAGM OF EARTH DAM AND METHOD OF ITS CONSTRUCTION
展开▼
机译:土坝防渗膜及其构造方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
the invention u043eu0442u043du043eu0441u0438u0442u0441u00a0 to u0433u0438u0434u0440u043eu0442u0435u0445u043du0438u0447u0435u0441u043au043eu043cu0443 construction. the purpose of u0438u0437u043eu0431u0440u0435u0442u0435u043du0438u00a0 improving reliability u043fu0440u043eu0442u0438u0432u043eu0444u0438u043bu044cu0442u0440u0430u0446u0438u043eu043du043du043eu0439 diaphragm through u0441u043eu043au0440u0430u0449u0435u043du0438u00a0 u043fu0440u043eu0442u00a0u0436u0435u043du043du043eu0441u0442u0438 joints between elements of the walls and their u0432u043eu0434u043eu043du0435u043fu0440u043eu043du0438 u0432u044bu043fu043eu043bu043du0435u043du0438u00a0 u0446u0430u0435u043cu044bu043cu0438 and by u0443u0434u043bu0438u043du0435u043du0438u00a0 a twist line current filter through the water while accelerating u0432u043eu0437u0432u0435u0434u0435u043du0438u00a0 and u0441u043eu043au0440u0430u0449u0435u043du0438u00a0 value.u043fu0440u043eu0442u0438u0432u043eu0444u0438u043bu044cu0442u0440u0430u0446u0438u043eu043du043du0430u00a0 diaphragm includes a vertically situated u0430u0441u0444u0430u043bu044cu0442u043eu0431u0435u0442u043eu043du0430 layer existing between the walls 1, 2 and 3, educated u043fu0430u043du0435u043bu00a0u043cu0438 4. panels 4 are installed so that the horizontal and vertical seams formed in one wall are indented relative to the u043fu0440u00a0u043cu043eu0443u0433u043eu043bu044cu043du043eu0439 projection on the wall joints between p u0430u043du0435u043bu00a0u043cu0438 4 in the other wall.in each of the four perimeter by u0441u043bu043eu00a0 u0430u0441u0444u0430u043bu044cu0442u043eu0431u0435u0442u043eu043du0430 1 implemented u0441u043au043eu0441u044b which form grooves extending along the horizontal joints and grooves, which wa olga vertical stitches. horizontal stitches are filled with a layer of asphalt.the diaphragm u043eu0441u0443u0449u0435u0441u0442u0432u043bu00a0u044eu0442 with an early phase increase its walls, installing each other concrete panels 4 u00a0u0440u0443u0441u0430u043cu0438 alternately each time the excessive ol u043eu0442u0438u0432u043eu0441u0442u043eu00a0u0449u0435u0439 half height wall panels 4. after the installation of each ordinary u00a0u0440u0443u0441u0430 panels 4 in one of the walls u0430u0441u0444u0430u043bu044cu0442u043eu0431u0435u0442u043eu043du043eu043c 1 u043eu0441u0443u0449u0435u0441u0442u0432u043bu00a0u044eu0442 filling space between the walls. 2. and u0437.u043f.u0444 - lu 5, 6).
展开▼