首页>
外国专利>
DEVICE FOR SIMULATION OF NON-STATIONARY ELECTROMAGNETIC FIELDS
DEVICE FOR SIMULATION OF NON-STATIONARY ELECTROMAGNETIC FIELDS
展开▼
机译:模拟非平稳电磁场的装置
展开▼
页面导航
摘要
著录项
相似文献
摘要
the invention u043eu0442u043du043eu0441u0438u0442u0441u00a0 to geophysics, and more specifically, to the technology of fashion u043bu0438u0440u043eu0432u0430u043du0438u00a0 u044du043bu0435u043au0442u0440u043eu0434u0438u043du0430u043cu0438u0447u0435u0441u043au0438u0445 processes for the electrolytic u043cu043eu0434u0435u043bu00a0u0445 u0433u0435u043eu044du043bu0435u043a u0442u0440u0438u0447u0435u0441u043au0438u0445 incisions. the purpose of u0438u0437u043eu0431u0440u0435u0442u0435u043du0438u00a0 - improve the accuracy and efficiency of measurement.the u0434u043eu0441u0442u0438u0433u0430u0435u0442u0441u00a0 u0443u043au0430u0437u0430u043du043du0430u00a0 so that the device u0434u043bu00a0 u043cu043eu0434u0435u043bu0438u0440u043eu0432u0430u043du0438u00a0 non-point electromagnetic fields contains model such electrically and geometrically studied object, u044du043bu0435u043au0442u0440u043eu043bu0438u0442u0438u0447u0435u0441u043au0443u044e bath, built-in second harmonic generator, first and second outputs which are connected to the entrance and the entrance u0433u0435u043du0435u0440u0430u0442u043e synchronization switching u0440u043du043eu0433u043e probe, a probethe exit of which is connected with a synchronous u0434u0435u0442u0435u043au0442u043eu0440u044d entrance, exit which is connected with the entrance of the registrar, the u0443u043fu0440u0430u0432u043bu0435u043du0438u00a0 in the form of a computer, an interface u043fu0430u0440u0430u043bu043b u0435u043bu044cu043du043eu0433u043e exchange, an additional interface, the choice of delay generator u0441u0442u0440u043eu0431u0438u0440u0443u044e - u0438u0446u0438u0445 pulses, the time intervals, a coordinate system and the controller.built-in second harmonic generator consists of u0444u043eu0440u043cu0438u0440u043eu0432u0430u0442u0435u043bu00a0 impulses, u0444u043eu0440u043cu0438u0440u043eu0432u0430u0442u0435u043bu00a0 clock pulses, the clock pulses of the delay, u0443u0441u0438u043bu0438u0442u0435u043bu00a0 power controller system u0435u0440u0436u0438u0442 scheme u0443u043fu0440u0430u0432u043bu0435u043du0438u00a0 movement rack, a correction u043cu0435u0441u0442u043eu043fu043eu043bu043eu0436u0435u043du0438u00a0 rack, a locking block u0442u043eu043au043eu0432u044bu0445 keys at the carriage, the discharge u0434u0432u0438u0436u0435u043du0438u00a0 rack, the beginning is the end u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 u043fu043eu0444u0438u043bu00a0, the delay of dischargethe counting and display blocks. the interface includes a ducted u043fu0440u0438u0435u043cu043eu043fu0435u0440u0435u0434u0430u0442u0447u0438u043au043eu0432, register functions, register u0441u043eu0441u0442u043eu00a0u043du0438u0439, registry, system input, system output, egr the ister, address decoder address. the coordinate system is composed of a rack, receiving the probe, the probe generator, detector u043fu043eu043bu043eu0436u0435u043du0438u00a0 rack, drive rack, platform, the sensor start. c u043fu0440u043eu0444u0438u043bu00a0.the invention u043fu043eu0437u0432u043eu043bu00a0u0435u0442 enhance accuracy and productivity u0431u043bu0430u0433u043eu0434u0430u0440u00a0 to automatically select the primary time u0441u0442u0430u043du043eu0432u043bu0435u043du0438u00a0 u043fu043eu043bu00a0 by u0441u0440u0430u0432u043du0435u043du0438 u00a0 experimental curve u0441u0442u0430u043du043eu0432u043bu0435u043du0438u00a0 with the design and use of self-contained regimes u043fu0440u043eu0444u0438u043bu0438u0440u043eu0432u0430u043du0438u00a0, u0437u043eu043du0434u0438u0440u043eu0432u0430u043du0438u00a0 and combined treatment. 5, z. s - lu, 1). on the pm of yu yu o n
展开▼