首页>
外国专利>
Checking admissibility of coupling 2 power sub-networks in parallel - constructing difference for each sub-network between measured and reference voltages
Checking admissibility of coupling 2 power sub-networks in parallel - constructing difference for each sub-network between measured and reference voltages
展开▼
机译:并行检查耦合2个功率子网的可允许性-在每个子网中测量和参考电压之间存在差异
展开▼
页面导航
摘要
著录项
相似文献
摘要
The time changes of the a.c. voltage in each sub-network, i.e. the field voltage (VF), is compared with the time changes of a reference voltage (VR, VR1) which is the same for all field units. The comparison takes place in the field unit associated with the sub-network concerned. A first difference is formed for the electrical voltage, phase and frequency and transferred to an evaluator (SE). The vaaluator compares the first difference for the first sub-network with the first difference for the second sub-network to form a second difference. This second difference is compared with given limits to devide whether the parallel configuration should be initiated. USE/ADVANTAGE - Checking whether to connect in parallel two sub-networks in supplying electrical power in switchgear. Simple. @(8pp
展开▼