首页>
外国专利>
Method for producing civil engineering works under a railway line which is in use without the use of auxiliary metal bridge floor (deck)
Method for producing civil engineering works under a railway line which is in use without the use of auxiliary metal bridge floor (deck)
展开▼
机译:在不使用辅助金属桥面(甲板)的情况下在铁路线下生产土木工程的方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The principle of this method lies in the use of bridge floors (decks) which are prefabricated at their definitive location instead of the conventional auxiliary metal bridge decks used to shore up the various infrastructure constructions of rail bridges. The definitive decks rest on a device of vertical supports of a first phase on which the definitive reinforced concrete header beams bear, the preliminary production of these constructions requiring only a simple and local reinforcement of the track. The design of the infrastructure constructions for the rail bridge incorporates the first phase vertical supports. This method according to the invention is particularly designed for any civil engineering bridge construction work under a track, of the rail bridge type. IMAGE
展开▼