首页> 外国专利> METHOD OF PUMPING UP EXTRA-BANKING CONCRETE OF CAST-IN-PLACE PILE FOR REMOVAL

METHOD OF PUMPING UP EXTRA-BANKING CONCRETE OF CAST-IN-PLACE PILE FOR REMOVAL

机译:拆除现浇桩的超大排量混凝土的方法

摘要

PURPOSE:To efficiently remove extra-banking concrete in a short time, by a method wherein a water pouring port is provided in a position in the vicinity of the suction port of a suction hose, and extra-banking concrete is pumped up through the water pouring port as water is poured. CONSTITUTION:A suction hose 3 is guided through a stand pipe 4, and a suction port 3a at the forward end of the hose 3 is inserted into an extra-banking pile 5a of a cast-in-place pile 5. With a vacuum pump driven, the concrete 5a is pumped up through the hose 3, and water is poured in through a feed water hose 8.
机译:目的:为了在短时间内有效地清除多余的混凝土,一种方法是在吸水管的吸入口附近设置注水口,然后将多余的混凝土泵入水中倒水时倒入端口。组成:一根吸水软管3穿过立管4,软管3前端的吸水口3a插入到现浇桩5的超堤岸桩5a中。在驱动下,混凝土5a通过软管3被泵送,并且水通过给水软管8被注入。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号