(57) [summary] (modified with) [purpose] building between the time required for logistics reduction and to improve the safety. [Configuration] to rail 4 carriage body capable of moving on 1, place the winch 7 of the appropriate number, integrally moved up and down to be able to be attached to mint 8 by these winches. To mint 8, attach the receiving seat 14 of the product, the cylinder device 15 to tilt the seat.
展开▼