首页> 外国专利> STEEL PIPE SHEET PILE, SEAL MEMBER USED FOR STEEL PIPE SHEET PILE AND WELL CONSTRUCTION METHOD USING STEEL PIPE SHEET PILE

STEEL PIPE SHEET PILE, SEAL MEMBER USED FOR STEEL PIPE SHEET PILE AND WELL CONSTRUCTION METHOD USING STEEL PIPE SHEET PILE

机译:钢管板桩,用于钢管板桩的密封件以及使用该管板桩的井施工方法

摘要

PURPOSE: To obviate the need of concrete discharging and digging work for the interior of a joint steel pipe by installing a seal member on the joint steel pipe of a steel pipe sheet pile formed of a main steel pipe and a joint steel pipe having a notch portion to cut off the notch portion. ;CONSTITUTION: A steel pipe sheet pile 10 is formed of fixing joint steel pipes 3 where a notch portion 4 is formed on both sides of a main steel pipe 2. The joint steel pipe 3 is formed by mounting a seal member 20 for shielding the notch portion 4. The seal material 20 is formed long using synthetic resin material by extrusion molding. The seal member is bent upward and a mounting surfaces 21 having a circular arc section are formed on the lower side thereof. The mounting surfaces 21 are provided corresponding to opposite notch portions of the outer peripheral surface of the joint steel pipe 3. Subsequently, the mounting surfaces 21 are brought into close contact with the outer peripheral surface of the joint steel pipe 3 to shield the notch portion 4. Thus, concrete can be prevented from entering the joint steel pipe 3 through the notch portion 4.;COPYRIGHT: (C)1993,JPO&Japio
机译:目的:通过在由主钢管和具有缺口的接头钢管构成的钢管板桩的接头钢管上安装密封部件,从而消除接头钢管内部的混凝土的卸压和挖掘作业的需要。切去缺口部分。 ;构成:钢管板桩10由固定接头钢管3形成,接头钢管3在主钢管2的两侧均形成有缺口部分4。接头钢管3通过安装用于遮挡接头钢管的密封部件20形成。切口部4。密封材料20使用合成树脂材料通过挤压成型而较长地形成。密封构件向上弯曲,并且在其下侧形成具有圆弧形截面的安装表面21。对应于接头钢管3的外周面的相对的切口部,设置有安装面21。接着,使安装面21与接头钢管3的外周面紧密接触,以遮蔽该切口部。 4.因此,可以防止混凝土通过切口部4进入接头钢管3。版权所有:(C)1993,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号