首页> 外国专利> START/END TIME CALCULATION METHOD FOR SCHEDULE OF WORK PRODUCTION LINE

START/END TIME CALCULATION METHOD FOR SCHEDULE OF WORK PRODUCTION LINE

机译:作业生产线调度的开始/结束时间计算方法

摘要

PURPOSE:To easily make a synthetic production plan by setting work start time in a work cell whose work order is first to be the start time of a schedule and work end time in a work cell whose work order is the last to be the end time of the schedule to output the time. CONSTITUTION:A warehouse 1 where works are stored, a line 2 along which a carriage carrying the works moves, a conveyor 3 and the work cells A, B, C and D are provided. The work start time and the work end time of the respective work cells A-D are calculated by the individual types of a classified parallel type or series type. Work start time in the work cell whose work order is the first is set to be the start time of the schedule and work end time in the work cell whose work order is the last is set to be the end time of the schedule among the calculation values so as to output them. Thus, the start/end time of the schedule can easily be calculated even in a work production line different in constitution. Then, start/end time can efficiently be calculated even if the work order differs.
机译:目的:通过在工作单首先是时间表的开始时间的工作单元中设置工作开始时间,并在工作单是最后一个结束时间的工作单元中设置工作结束时间,轻松制定综合生产计划时间表以输出时间。组成:一个仓库1,仓库中存储有作品,一条生产线2,载有该作品的车厢沿着该生产线2移动,一条传送带3以及工作单元A,B,C和D。各个工作单元A-D的工作开始时间和工作结束时间通过分类的并联类型或串联类型的各个类型来计算。在计算中,将工作顺序为第一个的工作单元中的工作开始时间设置为计划的开始时间,工作顺序为最后的工作单元中的工作结束时间设置为计划中的结束时间值以输出它们。因此,即使在构造不同的工件生产线中,也可以容易地计算出时间表的开始/结束时间。然后,即使工作顺序不同,也可以有效地计算开始/结束时间。

著录项

  • 公开/公告号JPH05258142A

    专利类型

  • 公开/公告日1993-10-08

    原文格式PDF

  • 申请/专利权人 株式会社小松製作所;

    申请/专利号JP19920052759

  • 发明设计人 清水 義信;

    申请日1992-03-11

  • 分类号G07C3/00;B23Q41/08;B65G43/00;G06F15/21;

  • 国家 JP

  • 入库时间 2022-08-22 05:15:44