(57) Abstract Objective In order the main line of the long line the time to do in the fixed taking drum,Supporting the person in charge stopping time dynamic component of the main line which time motion is done from both sides, the main lineThe vibration which is in the midst of taking job is prevented. Constitution From both sides of fixed taking drum 1 it directs to the front, pairTo oppose install guide framework 2.2, between guide framework 2.2 of the said pairAs sleeve body 3 of gate die is constructed front and back movement unrestrictedly, said SlidingThe main line guide component 9 which top and bottom motion is done is supported in the center section of dynamic body 3,On the bottom of the said main line guide component 9 time motion the main line person in charge stopping time dynamic component 1 which is doneProviding 2, locking the main line with the said main line person in charge stopping time dynamic component 12Evenly being something which it tries to stick in taking drum 1, the main linePreventing the vibration of the main line person in charge stopping time dynamic component 12 in during taking jobDoing, the main line it sticks smoothly easily.
展开▼