(57) Abstract Objective As for purpose of this device, the high class whose pile formation is long at high densityBeing the floor carpet, the heel mat firmly connectionThere are times when it sticks. Constitution In specified place of floor carpet 1 pile formation 1ABy melting or cuts, or installation crevice 1B formaAt place of forming and the said installation crevice 1B in hot melt adhesive 3Depending, adhesion heel mat 2.
展开▼