PIER FOR TUNNEL WORK, INVERT EXECUTION METHOD, AND TUNNEL CONSTRUCTION METHOD

机译:隧道工程用桩,倒立执行方法和隧道施工方法

摘要

PURPOSE: To prevent the progress of an excavation at a working face section from stagnating at the time of invert execution. ;CONSTITUTION: A mobile pier 9 is suspended between the bottom face 1b of an upper half section 6 and the bottom face 1b of a lower half section 7 in a tunnel 1. The mobile pier 9 is provided with a rock drill device 23 and a spray device 24 on the lower face of a frame 10, and the devices 23, 24 are arranged movably in the longitudinal direction of the mobile pier 9 along a traveling rail provided on the lower face of the frame 10. The rock drill device 23 is provided with an excavating boom 26, and the spray device 24 is provided with a spraying boom 28. The lock bolt execution of the excavated lower half section 7, the concrete spraying work, and the invert execution are performed below the mobile pier 9. The rock drilling work for the lock bolt execution of the excavated lower half section 7 is performed by the rock drill device 23, and the concrete spraying work is performed by a spraying device 24. Invert concrete is placed after the work.;COPYRIGHT: (C)1994,JPO
机译:目的:为防止倒立执行时工作面部分的挖掘进度停滞。 ;构成:活动墩9悬挂在隧道1中的上半部分6的底面1b和下半部分7的底面1b之间。活动墩9设有凿岩装置23和喷射装置24设置在框架10的下表面上,并且装置23、24沿着设置在框架10的下表面上的移动轨道在移动墩9的纵向上可移动地布置。凿岩装置23是设置有挖掘吊臂26,并且喷涂装置24设置有喷涂吊臂28。挖掘的下半部7的锁紧螺栓执行,混凝土喷涂工作和倒置执行在活动桥墩9的下方进行。下半部7的锁定螺栓的凿岩工作由凿岩装置23进行,混凝土的喷射作业由喷射装置24进行。倒置后的混凝土被浇筑。 1994年,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号