首页> 外国专利> Crushed stone stuffing union for railroad roadbed laying

Crushed stone stuffing union for railroad roadbed laying

机译:铁路路基铺设的碎石填料联合会

摘要

(57) Abstract Objective Laying job of the crushed stone being easy, after the laying the downgrade of the crushed stoneSeeing is little, extending to the long period of time, can decrease the vibration and noiseIt designates that the sea urchin it does as purpose. Constitution The crushed stone is justified to the network condition sack 1 which, consists of the Kevlar conjunctionTo become the wa se te, this on both sides of the carriage rail and both sides of the roadbedExtending to the long period of time, to the ru by laying, the vibration and noiseIt decreases.
机译:(57)<摘要> <目的>碎石的铺设容易,铺设碎石的降级后视线很小,延长到很长一段时间,可以减少振动和噪音它表示海胆照此办事。 <组成>碎石被证明适合于网络条件袋1,该网络袋由凯夫拉结组成,成为水桶,在车厢轨道的两侧和路基的两侧都延长了很长时间,直到通过铺设,振动和噪音降低。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号